completed Project

  • NWB6 Production Facilities – Flow line Transient Analysis, UK.
  • QRA study for Pride Packaging project, OQ, OMAN.
  • HAZOP Facilitation for Glycol Debottlenecking System, UK.
  • Claymore Sidetrack and Workover Well C58 – Slugging Analysis (In OLGA), UK.
  • As Building of Catalytic Point Gas Detectors Work pack 8 and 10- Instrumentation upgrade, UK.
  • Replace Local Deck Plating- Structural Modification scope for replacing Kennedy gratings, UK.
  • Design Review Facilitation for Fire Network modifications, Orpic, OMAN.
  • Claymore – Oil Export – Pump Outages Post SD Pipework Replace- Instrumentation Detailed Design, UK.
  • Shell Gannet DGS – N2 Seals Dispersion Study, UK.
  • HAZOP Facilitation for recovered oil from drain re-routing, UK.
  • HAZOP Facilitation for Test separator divertor valve modifications, UK.
  • Armada Destec Seal ring Replacement NWS & Maria –  Piping Drawings, Civil Support Drawings & Load data Preparation, UK.
  • Sand Transport modelling in subsea well to Offshore Platform.
  • Water hammer effect study for BW offshore PW injection system
  • DP6 DP8 pipeline Transient Analysis for Spirit Energy.
  • FG Import -Low Temperature study (Riser ESDV opening) for Spirit Energy.
  • Minimum Temp Analysis for FG Import Scrubber during platform startup –Spirit Energy
  • Transient simulation for N16, N7 and BK8 wells for Apache
  • Slug prediction and impact of the slug on pipeline/piping configuration for Iona-3 pipeline for Lochard Facility in Australia
  • Fire Water network hydraulic study (steady state as well as transient) for UK client.
  • Process support for finalizing the concept of flare gas recovery facility for Oman client through Norwegian EPC company.